Project: Crawford Primary School
Location: Crawford Road, London SE5
Size: 9,500 sqm
Cost: £1.8m
Client: Southwark Council
Architect: Alexi Marmot & Associates
Completed: March 2009

Complete refurbishment of an existing primary school with the addition of a new Children’s Centre building. The existing building, built in the 1960s, houses the nursery & year 1 classes. Scope of works included new roof coverings, the refurbishment of existing rooflights, new internal walls, toilets, ceilings & floor finishes. The new Children’s Centre building was built to house the new reception, large meeting room & family room, with a new covered walkway from the street with circular rooflights. Brick/block cavity wall construction, with double glazed curtain wall and zinc cladding/roof coverings.
eCAD produced 3D renderings of the the new Childrens Centre building, during the concept design stage, and went onto provide full construction documentation for both the new building & the refurbishment of the existing. The project was phased over 12 months, to minimize disruption to the school, and was fully occupied in March 2009.

close window


provider of remote drafting services to the architecture design industry
© e-cad pty ltd 2011